| Non-refundable portion of the fees listed below for processing wastewater treatment system, site evaluations, groundwater monitoring applications, and subdivision submittals. |
$50 |
| WASTEWATER TREATMENT SYSTEMS |
|
| Site evaluation for new construction |
$200 |
| Standard trench wastewater treatment system approved by state DEQ under the sanitation in subdivision regulations and replacement systems with nondegradation analysis completed. |
$225 |
| Permit for minor changes to existing wastewater treatment system, e.g. replacing septic tank, installing risers, repair of less than 10 feet of piping |
$100 |
| Standard trench wastewater treatment system without state approval, includes nondegradation analysis |
$325 |
| Pressure-dosed and elevated sand mound review, does not include nondegradation analysis |
$300 |
| Experimental and Other wastewater treatment systems with pland and specification review, and package plants (aerobic treatment, trickling filters, other manufacturer systems), does not include nondegradation analysis |
$350, then $50 per hour if review and research exceed 7 hours. |
| Wastewater treatment system variance |
$200 |
| Penalty fee for starting construction without wastewater treatment permit - Property Owner - (maximum penalty per day) |
$1,000 |
| Penalty fee for starting construction without wastewater treatment permit - Building Contractor/Excavation Contractor - (maximum penalty per day) |
$500 |
| Reinspection of wastewater treatment system after it has failed the final inspection |
$100 |
| Inspection of Septage Disposal Site |
$200 |
| WELL PERMITS |
|
| Well Permit |
$25 |
| Penalty for drilling a well without a well permit |
$200 |
| REVIEW and TESTS |
|
| Nondegradation (both phosphorus and nitrate calculations) |
$100 |
| Phosphorus Breakthrough Calculation |
$50 |
| Nitrate Sensitivity Analysis |
$50 |
| Radon Test Kit (short-term) |
$7 |
| Radon Test Kit (long-term) |
$25 |
| Water Sampling |
$35 per hour |
| GROUNDWATER MONITORING |
|
| Groundwater Monitoring Application Fee (includes one test pipe) |
$150 per parcel |
| Additional Pipes - each pipe |
$30 |
| One Time Mileage Fee - within 5 miles of the Administrative Center |
$20 |
| One Time Mileage Fee - greater than 5 miles but less than or equal to 10 miles from the Administrative Center |
$30 |
| One Time Mileage Fee - greater than 10 miles but less than or equal to 20 miles from the Administrative Center |
$40 |
| One Time Mileage Fee - greater than 20 miles from the Administrative Center |
$50 |
| CERTIFIED WASTEWATER TREATMENT (SEPTIC SYSTEM) INSTALLERS |
|
| Installer Certification Exam |
$100 |
| Certified Installer Annual Renewal |
$25 |
| SUBDIVISION SUBMITTALS |
|
| Sufficiency Review Fee (DEQ Submittals) |
$50 |
| Sufficiency Review Fee (Subdivision Exemption Requests - parcels 20 acres or greater are exempt from this fee) |
$100 |
| Modified Site Plan (DEQ "as-built", modified or amended approval review) |
$100 |
| RESTAURANTS, PUBLIC ACCOMODATIONS AND OTHER DPHHS LICENSES |
|
| Plan Review |
$100 |
| Reinspection of a licensed facility when the findings of one previous inspection demands a second inspection to determine compliance with violations not previously corrected |
$100 |
| Administrative fee for late licenses |
$25 per month |
| COPIES |
|
| One (1) copy (first page) |
$0.50 |
| 2-25 copies (each page) |
$0.25 |
| 26 or more pages (each page) |
$0.15 |
| October-06 |
|